The person or activity issuing the property (for example the primary hand receipt holder).
DA 2062: Hand Receipt/Shortage Listing
The DEC 2023 hand receipt: from/to, hand receipt identifier, the end-item row for shortage listings, and item lines with material numbers, ARC, CIIC, and quantity columns A–F.
HAND RECEIPT/SHORTAGE LISTING
For use of this form, see AR 710-4. The proponent agency is DCS, G-4.
The PDF opens in Acrobat, Preview or your browser with every block ready to type in. Downloading needs a free account.
Every block on the DA Form 2062
Laid out block for block like the official HAND RECEIPT/SHORTAGE LISTING (DEC 2023 edition), with the instruction for each block. Name, rank, and unit prefill from your service profile.
Form details
- From
- To
The person receiving and becoming responsible for the property.
- Hand Receipt Identifier
- Items
One line per item. ARC is the accounting requirements code (N = nonexpendable, D = durable, X = expendable); CIIC is the controlled inventory item code (for example 7 or 8 for arms). Columns A–F under h. record the quantity for successive transactions or inventories. The e-form is used with handwritten signatures when several people inventory on one form.
Complete this row for shortage listing or chr
- End Item Material Number
Only for a shortage listing or component hand receipt: the end item's material number (NSN).
- End Item Description
- Publication Number
The TM that lists the end item's components (the -10 or -13&P).
- Publication Date
- Quantity
How to fill out the DA Form 2062
Transfers responsibility for property from one person to another (a hand receipt or sub-hand receipt), or lists what's missing from an end item (a shortage listing or component hand receipt). The signature makes the receiver responsible for what's listed. When: When you sign for or sub-hand-receipt equipment, at change-of-command and change-of-hand-receipt-holder inventories, during cyclic and sensitive-item inventories, and when you need to record shortages against an end item's component list.
Step by step
- Enter FROM (the person or activity giving the property) and TO (the person receiving it), plus the hand receipt identifier.
- For a shortage listing or component hand receipt (CHR), complete the end-item row: material number, description, the TM or publication and its date, and the end-item quantity.
- List each item on its own line: item number, material number (NSN or LIN as your PBO directs), description with serial numbers, ARC, CIIC, unit of issue, and quantity authorized.
- Record the quantity actually on hand under the lettered quantity columns A–F, one column per transaction or inventory.
- Lay out and count every item before anyone signs. The receiver signs only for what was physically seen.
What a strong one looks like
- Write serial numbers into the description for every serialized item and verify them against the item itself, not the old hand receipt.
- Use the TM's components-of-end-item and basic-issue-item lists to build a shortage listing, and note any shortage document numbers on order.
- Keep your copy. It's your proof of what you signed for if there's ever a financial liability investigation.
Common mistakes
- Signing for items you didn't physically see ("it's in the connex somewhere").
- Mismatched serial numbers or unit of issue (EA vs. SE vs. KT).
- Letting sub-hand receipts lapse after a PCS, leaving you responsible for property you no longer control.